Pre-Construction
Includes design, authority approvals, tender and audit works.
Earthworks
Re-shaping of the ground to allow construction of roads and drainage connection to each lot. Estimated timeframe 4-6 weeks.
sewer and
drainage
drainage
Provision of a sewer connection to each lot and underground drainage system. Estimated timeframe 8 weeks.
water and gas
Provision of water and gas pipeline connections to each lot. Estimated timeframe 3-4 weeks.
sub-grade
Developing a firm material base underneath roads and footpaths. Construction of kerbs and drains to enable channels from stormwater to travel to underground drainage system.
electrical and nbn
Electrical cabling and NBN to enable internet connection for each lot.
Footpaths
and roads
and roads
Footpaths, asphalt, topsoiling and road completion.
construction
complete
complete
Completion of the construction works. Home construction will commence after civil construction is completed.
Comments
Alfie - Solar Systems and FIT Credits Update - May 2025
Important Information Regarding Solar Systems and FIT Credits
Dear Alfie Residents,
We are writing to you with an important update regarding the solar systems and Feed-in Tariff (FIT) credits for your Alfie home.
Our team is advised that some residents are missing solar compliance certificates that were provided at handover. As we do not hold this information on file, Development Victoria is currently working with its partners to provide these to Origin Energy on your behalf to enable Origin to allocate FIT credits. If you are contacting Origin directly, please let them know that you are part of the embedded network at 430 Blackshaws Road, and not a standard residential customer.
To get the most value from your solar system, it's more cost-effective to use the power it generates, not rely on FIT credits.
For use of the solar, if you are still experiencing issues, please reply to this email. When doing so, be sure to include the following information:
*Your address and lot number
*A clear description of the issue
*A reference to the relevant section/error code in the manual
*Any supporting photos
By way of assistance, we have included below manuals for the solar PV systems (your inverter will have the model noted):
Alfie Stage 1 UM_202010_SG2-8K G2 Premium User Manual_V1.5
Alfie Stage 2 & 3 Chromagen GW_ES_User Manual-EN
Alfie Stage 2 & 3 Chromagen GW_EM_User Manual-EN
Also included below are links for an updated app that is available for Stages 2 & 3. For Stage 1, there is a QR code on the inverter with the link.
Stage 2 & 3 - Google Play Store
Stage 2 & 3 - Apple App Store
Development Victoria will also upload this correspondence to the Alfie Connect Portal for future access.
Please Note: If there are power surges, or other factors, Powercor may temporarily shut down the solar systems as a safety measure. This is a normal part of how the system operates and is not cause for concern. It is applicable to any PV systems that are attached to their grid system, and not limited to Alfie.
If you have a tenant or know of any new owners, we kindly ask that you ensure this information is forwarded accordingly.
Thank you for your attention to this matter.